The land and buildings are privately owned.
There are five existing buildings (production halls) on the land: C1, C2, C3, C4, and C5.
C1, C2, C3, and C5 are fully Air-conditioned. In addition, all buildings are equipped with LED Lighting.
According to the adopted spatial plan, an additional production hall can be built on the land.
- 5 transformer stations in total 5MW;
- Cogeneration devices gas = electricity + heating;
- 2x Heat power 549kW;
- 2x Electrical 400kW;
- Gas pipeline connection;
- Centralized compressor station;
- Wastewater treatment of industrial water on the internal wastewater cleaning station;
- OPTION: Solar power plant; 1,5MW Yearly 1.560MW.
Industrial buildings
Industrial buildings
No
for rent
electric current - connection power: 5MW
pipeline
water supply
optical network
telephone network
sewage
heating
Yes
YES, authorization exists