The construction of a spa, rehabilitation and tourist thermal centre can be considered as an independent investment project. Depending on the characteristics of the borehole (water temperature is 80 ° C and flow rate 50l / s), it is reasonable that the proposed investment project is part of a wider investment project. This conceptually covers two additional projects:
1.) The exploitation of geothermal water to generate electricity and "capture" natural CO2. By obtaining geothermal energy, the water temperature is lowered to the level required for use in geothermal pools and for heating / cooling the complex. However, naturally occurring CO2 is used in the food industry. This investment project is also ready.
2.) Use of geothermal energy and water for heating and irrigating greenhouses. The preliminary design is prepared in accordance with the regulations, the temperature of the water that can be returned to the well is determined.
The basic project envisages the construction of hotel accommodation, cottages, a health and rehabilitation centre, a recreation and tourist complex. The owner of the investment project is also the owner of the land and has signed a contract with the competent authorities on the use of the well with hot water.
25000000 €
7,2% - 11% annual
It is in the process of being acquired